SEAT RING,VALVE,SIZE WU886,MONEL

Material 4100050460 · SEAT RING · Plant 1000

BReorderCriticalStockout
Material
4100050460
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
110 d · P80 184 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Forecast 2.5 EA/year: 1.8 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~110 days; expected demand during lead time 1.2 (incl. 0.7 planned).
  • 3.A 98.6% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 7 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 79.0M · order by 01 Oct 2026
Expected arrival ≈ 110 days
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
7
order qty 3
Service level
98.6%
stockout risk now 100%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 10 days ago, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 204.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~65 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1246
HE-554 LEVEL CONTROL
B100.12
PX_FCV-1834
CONDENSATE FLOW CONTROL
S100.11

Lead time and procurement

Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Dec 2026PX_LCV-1246Final Element Overhaul; Control Valve0.72

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20262201000006305Corrective
21 Sept 20261201000006305Corrective