SEAT RING,VALVE,TYPE CD360,VITON
Material 4100050497 · SEAT RING · Plant 1000
AReduceNon-moving
- Material
- 4100050497
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 110 d · P80 184 d
- Unit price
- Rp 11.3M (est.)
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~110 days; expected demand during lead time 0.0.
- 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 5 exceeds the level to keep (1) by 4.
- 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.0%
stockout risk now 0%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 47.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1081A CONTROL VALVE | A | 1 | 0 | 0.11 |
| PX_PCV-1132 PP-657C PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_FCV-465 PP-1029C OUTLET FLOW | C | 1 | 2 | 0.54 |
| PX_TCV-1185 TEMPERATURE CONTROL VALVE | C | 1 | 1 | 0.12 |
Lead time and procurement
Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Oct 2025 | Medium | PX_FCV-465 | Painting FCV-465 |
| 27 Jul 2025 | Medium | PX_FCV-465 | Overhaul FCV-465 |
| 29 May 2025 | Medium | PX_TCV-1185 | TCV-1185; valve hunting |
Recent goods issues
Never issued in the 17-month history.