SEAT RING,VALVE,TYPE AK524,VITON
Material 4100050575 · SEAT RING · Plant 1000
AReduceExcess
- Material
- 4100050575
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 110 d · P80 184 d
- Unit price
- Rp 11.3M (est.)
Recommendation
- 1.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~110 days; expected demand during lead time 0.4.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.Stock 7 exceeds the level to keep (5) by 2.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 15 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-377C TEMPERATURE CONTROL VALVE | A | 1 | 3 | 0.98 |
| PX_LCV-275C HE-556A LEVEL CONTROL | A | 1 | 2 | 0.55 |
| PX_TCV-998 PP-1470A TEMP CONTROL | B | 1 | 4 | 1.83 |
Lead time and procurement
Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Aug 2026 | Medium | PX_TCV-998 | TCV-998 passing |
| 18 Aug 2026 | Low | PX_LCV-275C | LCV-275C passing |
| 05 Aug 2026 | Medium | PX_TCV-998 | Leak from packing |
| 02 Aug 2026 | Medium | PX_TCV-998 | [MSI-B-26-EHU-261] Permanent repair |
| 13 Jul 2026 | Low | PX_TCV-377C | TCV-377C stuck |
| 21 May 2026 | Medium | PX_TCV-377C | Painting TCV-377C |
| 27 Aug 2025 | Medium | PX_TCV-998 | TCV-998; IA leak from regulator |
| 17 Jun 2025 | Low | PX_TCV-377C | TCV-377C stuck |
| 03 May 2025 | Medium | PX_LCV-275C | LCV-275C passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Sept 2026 | 1 | 201000039961 | Corrective |