SEAT RING,VALVE,MODEL SK982,A105
Material 4100050651 · SEAT RING · Plant 1000
BLong-leadReduceSlow-moving
- Material
- 4100050651
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- SAMUDRA UTAMA GLOBAL PT
- Lead time
- 114 d · P80 184 d
- Unit price
- Rp 8.9M
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~114 days; expected demand during lead time 0.1.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 42 exceeds the level to keep (2) by 40.
- 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
42 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 8.9M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 263 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 92.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~65 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-813 PP-1063 TEMP CONTROL | B | 1 | 0 | 0.12 |
| PX_LCV-492 HE-337B LEVEL CONTROL | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 114 ± 58 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 18 Nov 2025 | PR03 Regular replenishment | 1 | Rp 9.0M | 02 Apr 2026 | 135 d |
| 11 Jun 2025 | PR04 Regular (other) | 1 | Rp 8.9M | 26 Sept 2025 | 107 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Jan 2026 | 1 | 201000009702 | Corrective |