SEAT RING,VALVE,SIZE WI670,SS304

Material 4100050899 · SEAT RING · Plant 1000

BLong-leadReduceExcess
Material
4100050899
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
107 d · P80 184 d
Unit price
Rp 25.0M

Recommendation

  • 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~107 days; expected demand during lead time 0.3.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 4 exceeds the level to keep (3) by 1.
  • 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
4 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 25.0M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 93 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 318.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~65 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1460
BY PASS DUCT
B171.79
PX_PCV-1847B
PRESSURE CONTROL VALVE
S100.08

Lead time and procurement

Lead time 107 ± 58 days (PO history + category, 1 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
21 Dec 2025PR06
Regular replenishment
1Rp 25.0M29 Mar 202698 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Sept 2026MediumPX_PCV-1460PCV-1460 passing
01 Sept 2026MediumPX_PCV-1460Install scaffolding at PCV-1460
11 Apr 2026EmergencyPX_PCV-1460Install scaffolding at PCV-1460
05 Apr 2026EmergencyPX_PCV-1460Install scaffolding at PCV-1460
06 Mar 2026LowPX_PCV-1460Leak from packing
27 Sept 2025LowPX_PCV-1460Overhaul PCV-1460
19 Jul 2025LowPX_PCV-1460Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
30 Jun 20261201000010057Corrective