SEAT RING,VALVE,TYPE HV641,MONEL
Material 4100051867 · SEAT RING · Plant 1000
AReorderCriticalStockout
- Material
- 4100051867
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 110 d · P80 184 d
- Unit price
- Rp 11.3M (est.)
Recommendation
- 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~110 days; expected demand during lead time 0.3.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 67.7M · order by 01 Oct 2026
Expected arrival ≈ 110 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 15%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 141 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 733.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1307B PRESSURE CONTROL VALVE | A | 1 | 1 | 0.08 |
| PX_LCV-896A LEVEL CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_TCV-503 PP-1012C TEMP CONTROL | S | 1 | 2 | 0.55 |
Lead time and procurement
Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Apr 2026 | Emergency | PX_TCV-503 | TCV-503; small leak at packing |
| 07 May 2025 | Medium | PX_TCV-503 | Install scaffolding at TCV-503 |
| 05 May 2025 | Low | PX_PCV-1307B | PCV-1307B; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 May 2026 | 2 | 201000022009 | Corrective |