SOLENOID VALVE,TYPE PY221,A182F11
Material 4100051908 · SOLENOID VALVE · Plant 1000
ASafety-criticalReorderNormalSlow-moving
- Material
- 4100051908
- Category
- SOLENOID VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (24 of 56 FuncLocs A/B, 45 safety/shutdown valve)
- Supplier
- GUNUNG PERKASA NUSANTARA PT
- Lead time
- 41 d · P80 39 d
- Unit price
- Rp 11.9M
Recommendation
- 1.Safety-critical element: installed on 45 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 6.4 EA/year: 6.4 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~41 days; expected demand during lead time 0.7.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
- 5.On hand 1 + on order 1 is at or below the reorder point: order 5 now.
- 6.Installed on 56 FuncLoc(s), 24 of them criticality A/B.
- 7.ML early warning: 44% probability of demand in the next 90 days.
Proposed purchase requisition
5 EA
Rp 59.7M · order by 01 Oct 2026
Expected arrival ≈ 41 days
Safety-critical (SCE)ML early warningSingle sourceOpen PO
On hand / on order
1 / 1
next delivery 15 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
99.9%
stockout risk now 4%
Unit price
Rp 11.9M
PO history
ML early warning: 44% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 216 days ago, 9 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.
Installed on 56 functional locations
24 with criticality A/B · 76 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_KT-513 TURBINE FOR KC-513 | A | 1 | 2 | 1.53 |
| PY_SDV-1443B RECYCLE ETHANE ISOLATION | A | 1 | 2 | 0.48 |
| PX_SDV-1463B SLOP OIL ISOLATION | A | 1 | 1 | 0.06 |
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
| PX_SDV-1120 FUEL OIL ISOLATION | A | 1 | 0 | 0.06 |
| PX_SDV-114 ON-OFF VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-1238 PP-1269A SHUTDOWN VALVE | A | 4 | 0 | 0.06 |
| PX_SDV-1270 WASH WATER ISOLATION | A | 1 | 0 | 0.06 |
| PX_SDV-1493 HE-1772B SHUTDOWN VALVE | A | 4 | 0 | 0.06 |
Lead time and procurement
Lead time 41 ± 11 days (PO history, 4 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Sept 2026 | PR03 Regular replenishment | 1 | Rp 12.0M | 15 Oct 2026 open | 28 d |
| 28 Jun 2026 | PR03 Regular replenishment | 2 | Rp 12.0M | 06 Aug 2026 | 39 d |
| 30 Aug 2025 | PR03 Regular replenishment | 1 | Rp 11.9M | 07 Oct 2025 | 38 d |
| 25 Jul 2025 | PR03 Regular replenishment | 2 | Rp 11.6M | 02 Sept 2025 | 39 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Low | PX_SDV-1667 | Painting SDV-1667 |
| 21 Sept 2026 | Low | PY_SDV-1443B | Repair insulation SDV-1443B |
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 23 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 19 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Feb 2026 | 1 | 201000006946 | Corrective |
| 15 Feb 2026 | 1 | 201000034114 | Corrective |
| 26 Jan 2026 | 1 | 201000029446 | Corrective |
| 16 Jan 2026 | 1 | 201000030451 | Corrective |