SOLENOID VALVE,SIZE LR365,PTFE

Material 4100051941 · SOLENOID VALVE · Plant 1000

ASafety-criticalLong-leadMonitorHealthy
Material
4100051941
Category
SOLENOID VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (14 of 29 FuncLocs A/B, 21 safety/shutdown valve)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
51 d · P80 97 d
Unit price
Rp 6.6M

Recommendation

  • 1.Safety-critical element: installed on 21 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 4.7 EA/year: 4.7 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~51 days; expected demand during lead time 0.7.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 5.Long lead time: 80% of deliveries took up to 97 days and the fastest seen in its category 35 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 29 FuncLoc(s), 14 of them criticality A/B.
  • 7.ML early warning: 50% probability of demand in the next 90 days.
Safety-critical (SCE)Long-leadML early warningSingle source
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 6.6M
PO history
ML early warning: 50% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 87 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 29 functional locations

14 with criticality A/B · 41 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A372.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KT-460B
TURBINE FOR KC-460B
A421.96
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_SDV-121
ON-OFF VALVE
A100.06
PX_SDV-124
DILUTION STEAM ISOLATION
A200.06
PX_SDV-1862
ON-OFF VALVE
A100.06
PX_SDV-584
REFLUX ISOLATION
A100.06
PX_SDV-626B
VD-534A SHUTDOWN VALVE
A100.06
PY_SDV-1845
CAUSTIC ISOLATION
A100.06
PX_SDV-1540
PP-1250 SHUTDOWN VALVE
B100.06
PX_SDV-1771
ON-OFF VALVE
B100.06

Lead time and procurement

Lead time 51 ± 19 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
27 Sept 2025PR03
Regular replenishment
2Rp 6.6M11 Dec 202575 d
12 Aug 2025PR06
Regular replenishment
2Rp 6.6M18 Sept 202537 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 Jun 2026MediumPX_SDV-398ASDV-398A fail to close
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
24 May 2026HighPX_KT-383AKT-383A steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
08 Sept 20261203000039516Turnaround
06 Jul 20261201000030618Corrective
25 Dec 20251201000038819Corrective
15 Oct 20251201000026389Corrective
30 Sept 20251204000021212Preventive
23 Sept 20251201000033203Corrective