SOLENOID VALVE,TYPE ZX236,NBR

Material 4100051968 · SOLENOID VALVE · Plant 1000

ASafety-criticalLong-leadReduceSlow-moving
Material
4100051968
Category
SOLENOID VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 15 FuncLocs A/B, 8 safety/shutdown valve)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
54 d · P80 97 d
Unit price
Rp 29.4M

Recommendation

  • 1.Safety-critical element: installed on 8 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 4.8 EA/year: 4.8 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~54 days; expected demand during lead time 0.7.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 5.Stock 7 exceeds the level to keep (6) by 1.
  • 6.Long lead time: 80% of deliveries took up to 97 days and the fastest seen in its category 35 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 15 FuncLoc(s), 8 of them criticality A/B.
  • 8.ML early warning: 33% probability of demand in the next 90 days.
Safety-critical (SCE)Long-leadML early warningSingle source
On hand / on order
7 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 29.4M
PO history
ML early warning: 33% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 369 days ago, 8 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 15 functional locations

8 with criticality A/B · 19 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_SDV-1940B
ON-OFF VALVE
A120.06
PX_SDV-709
VD-840 SHUTDOWN VALVE
A120.91
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_SDV-459B
HE-132D SHUTDOWN VALVE
B430.91
PX_SDV-1177B
HYDROGEN ISOLATION
B200.06
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KT-624A
TURBINE FOR KC-624A
S132.39
PX_SDV-1594
METHANE ISOLATION
S130.91

Lead time and procurement

Lead time 54 ± 19 days (PO history + category, 1 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
24 Aug 2025PR03
Regular replenishment
2Rp 29.4M03 Nov 202571 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
08 Aug 2026MediumPX_SDV-459BLeak from packing
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
06 Jun 2026MediumPX_SDV-1594Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
27 Sept 20251201000038407Corrective
26 Sept 20251201000038407Corrective