SOLENOID VALVE,SIZE MS479,INCOLOY

Material 4100051974 · SOLENOID VALVE · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100051974
Category
SOLENOID VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 14 FuncLocs A/B, 10 safety/shutdown valve)
Supplier
No PO history
Lead time
48 d · P80 97 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Safety-critical element: installed on 10 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 5.0 EA/year: 5.0 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~48 days; expected demand during lead time 0.7.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
  • 5.On hand 3 + on order 0 is at or below the reorder point: order 5 now.
  • 6.Installed on 14 FuncLoc(s), 8 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 56.4M · order by 01 Oct 2026
Expected arrival ≈ 48 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
8
order qty 3
Service level
99.9%
stockout risk now 1%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 50 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 14 functional locations

8 with criticality A/B · 15 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_SDV-1362
HE-1703C SHUTDOWN VALVE
A110.06
PX_SDV-584
REFLUX ISOLATION
A100.06
PX_SDV-739A
VD-1963 SHUTDOWN VALVE
A100.06
PY_SDV-1557
ON-OFF VALVE
A100.06
PX_SDV-293
HE-126A SHUTDOWN VALVE
B110.48
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_SDV-1195
COOLING WATER ISOLATION
S110.48
PX_SDV-1298
METHANOL ISOLATION
S110.48
PX_SDV-935
ON-OFF VALVE
S110.06

Lead time and procurement

Lead time 48 ± 19 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
11 Jun 2026LowPX_KT-264ALeak from packing
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
12 Aug 20261201000018816Corrective
10 Oct 20252201000037195Corrective