SOLENOID VALVE,TYPE YN420,A182F11

Material 4100052003 · SOLENOID VALVE · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100052003
Category
SOLENOID VALVE
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 12 FuncLocs A/B, 8 safety/shutdown valve)
Supplier
HOKUTO INSTRUMENT CO LTD
Lead time
41 d · P80 37 d
Unit price
Rp 11.3M

Recommendation

  • 1.Safety-critical element: installed on 8 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.2 EA/year: 3.2 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~41 days; expected demand during lead time 0.4.
  • 4.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 6.Installed on 12 FuncLoc(s), 3 of them criticality A/B.
  • 7.ML early warning: 38% probability of demand in the next 90 days.
Proposed purchase requisition
6 EA
Rp 67.7M · order by 01 Oct 2026
Expected arrival ≈ 41 days
Safety-critical (SCE)ML early warningConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.7%
stockout risk now 25%
Unit price
Rp 11.3M
PO history
ML early warning: 38% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 309 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 12 functional locations

3 with criticality A/B · 17 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_SDV-293
HE-126A SHUTDOWN VALVE
B110.48
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KT-264A
TURBINE FOR KC-264A
S442.39
PX_SDV-277
PP-588 SHUTDOWN VALVE
S110.06
PX_SDV-1096C
ON-OFF VALVE
S100.06
PX_SDV-1218
ON-OFF VALVE
S100.06
PX_SDV-1290
ON-OFF VALVE
S100.06
PX_SDV-1338
FLUSHING OIL ISOLATION
S100.06
PX_SDV-1869
ON-OFF VALVE
S300.06
PX_SDV-415
ON-OFF VALVE
S100.06

Lead time and procurement

Lead time 41 ± 13 days (PO history, 3 PO lines) · on-time 60%

PR dateTypeQtyUnit priceDeliveryLead time
17 Aug 2026PR03
Regular replenishment
1Rp 11.3M13 Sept 202627 d
22 May 2026PR06
Regular replenishment
1Rp 10.8M30 Jun 202639 d
19 Nov 2025PR06
Regular replenishment
2Rp 11.3M23 Dec 202534 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
11 Jun 2026LowPX_KT-264ALeak from packing
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
26 Nov 20251201000034192Corrective
30 Sept 20251201000017476Corrective
04 Aug 20251201000027512Corrective
24 May 20252201000022889Corrective