SOLENOID VALVE,MODEL LM940,PTFE

Material 4100052016 · SOLENOID VALVE · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100052016
Category
SOLENOID VALVE
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 9 FuncLocs A/B, 8 safety/shutdown valve)
Supplier
MEGA TEKNIK MAKMUR PT
Lead time
55 d · P80 97 d
Unit price
Rp 7.6M

Recommendation

  • 1.Safety-critical element: installed on 8 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~55 days; expected demand during lead time 0.2.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
  • 6.Long lead time: 80% of deliveries took up to 97 days and the fastest seen in its category 35 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 9 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 30.2M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 16%
Unit price
Rp 7.6M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 391 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 852.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 9 functional locations

1 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_SDV-619A
FLUSHING OIL ISOLATION
S130.91
PX_SDV-1725
HE-1279B SHUTDOWN VALVE
S120.48
PX_SDV-1181
HE-247D SHUTDOWN VALVE
S110.06
PX_SDV-896
C3 RECYCLE ISOLATION
S110.48
PX_SDV-1052
VD-687 SHUTDOWN VALVE
S100.06
PX_SDV-1599
PP-389 SHUTDOWN VALVE
S100.06
PX_SDV-315
ON-OFF VALVE
S100.06
PX_SDV-379A
PP-1807C SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 55 ± 19 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
10 Mar 2026PR01
Import / long-lead
2Rp 7.8M14 Jun 202696 d
17 Feb 2026PR03
Regular replenishment
1Rp 7.3M24 Mar 202635 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026LowPX_SDV-619ASDV-619A fail to close
30 May 2026MediumPX_SDV-1725SDV-1725 limit switch faulty
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
28 Dec 2025LowPX_SDV-619AReplace lamp as per PM finding
21 Aug 2025MediumPX_SDV-896Check SDV-896.ok
28 May 2025MediumPX_SDV-1181PSM25/SDV-1181 fail to close
18 May 2025MediumPX_SDV-619AReplace lamp as per PM finding
03 May 2025MediumPX_KT-513KT-513 governor valve hunting
03 May 2025LowPX_SDV-1725Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
05 Sept 20251201000014238Corrective
04 Sept 20251201000037360Corrective