SOLENOID VALVE,SIZE AR828,INCOLOY

Material 4100052025 · SOLENOID VALVE · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100052025
Category
SOLENOID VALVE
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 7 FuncLocs A/B, 4 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
57 d · P80 97 d
Unit price
Rp 17.0M

Recommendation

  • 1.Safety-critical element: installed on 4 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.2 EA/year: 2.2 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~57 days; expected demand during lead time 0.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 6.Long lead time: 80% of deliveries took up to 97 days and the fastest seen in its category 35 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 85.1M · order by 01 Oct 2026
Expected arrival ≈ 57 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 29%
Unit price
Rp 17.0M
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 246 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 7 functional locations

3 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_SDV-1353A
FEED ISOLATION
A310.06
PY_SDV-871
ON-OFF VALVE
B100.06
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KT-875
TURBINE FOR KC-875
S101.10
PX_SDV-153A
ON-OFF VALVE
S100.06
PX_SDV-1649B
PP-559A SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 57 ± 19 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
05 Oct 2025PR06
Regular replenishment
2Rp 17.0M20 Nov 202546 d
29 Jun 2025PR04
Regular (other)
1Rp 17.1M04 Oct 202597 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
17 Jul 2025MediumPX_SDV-1353AInstall scaffolding at SDV-1353A
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland
10 May 2025MediumPX_KT-397ALeak from packing