Sparely
DU

SOLENOID VALVE,MODEL RS73,PTFE

Material 4100052056 · SOLENOID VALVE · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100052056
Category
SOLENOID VALVE
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 4 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
No PO history
Lead time
48 d · P80 97 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.7 EA/year: 2.7 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~48 days; expected demand during lead time 0.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 90.3M · order by 01 Oct 2026
Expected arrival ≈ 48 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
8
order qty 3
Service level
100.0%
stockout risk now 13%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 415 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 784.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 4 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_SDV-1467A
VD-1378 SHUTDOWN VALVE
B100.06
PX_SDV-1404
RECYCLE ETHANE ISOLATION
S220.48
PX_SDV-1914
SPENT CAUSTIC ISOLATION
S100.06

Lead time and procurement

Lead time 48 ± 19 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
20 Nov 2025MediumPX_KT-419ALeak from packing
20 Nov 2025MediumPX_SDV-1404Install scaffolding at SDV-1404
10 Nov 2025MediumPX_KT-419APainting KT-419A
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
18 Jul 2025HighPX_SDV-1404Leak from packing
15 May 2025LowPX_KT-419APSM25/Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
12 Aug 20252201000013516Corrective
11 Aug 20251201000013516Corrective
11 Aug 20252201000013516Corrective