SOLENOID VALVE,MODEL GH207,GRAPHITE
Material 4100052068 · SOLENOID VALVE · Plant 1000
ASafety-criticalReduceNon-moving
- Material
- 4100052068
- Category
- SOLENOID VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 48 d · P80 97 d
- Unit price
- Rp 11.3M (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~48 days; expected demand during lead time 0.0.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 5.Stock 107 exceeds the level to keep (2) by 105.
- 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
107 / 0
no open PO
Today Min / Max
3 / 10
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 179.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_SDV-889 ETHYLENE ISOLATION | A | 1 | 0 | 0.06 |
| PX_KT-778A TURBINE FOR KC-778A | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 48 ± 19 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
| 12 Dec 2025 | Low | PX_KT-460B | KT-460B governor valve hunting |
| 20 Nov 2025 | Medium | PX_KT-856A | KT-856A governor valve hunting |
| 16 Nov 2025 | Low | PX_KT-856A | Install scaffolding at KT-856A |
| 04 Sept 2025 | Low | PX_KT-856A | Install scaffolding at KT-856A |
| 26 Aug 2025 | Low | PX_KT-856A | Replace lamp as per PM finding |
| 27 Jul 2025 | Medium | PX_KT-460B | Follow up after steam upset KT-460B |
| 09 May 2025 | Medium | PX_KT-856A | PSM25/KT-856A steam leak at gland |
Recent goods issues
Never issued in the 17-month history.