SOLENOID VALVE,TYPE NZ471,CS
Material 4100052092 · SOLENOID VALVE · Plant 1000
ASafety-criticalReorderCriticalInsurance gap
- Material
- 4100052092
- Category
- SOLENOID VALVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 3 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 48 d · P80 97 d
- Unit price
- Rp 11.3M (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.4 EA/year: 0.4 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~48 days; expected demand during lead time 0.0.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
- 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 22.6M · order by 01 Oct 2026
Expected arrival ≈ 48 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 5%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 275.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_SDV-1005C ON-OFF VALVE | B | 1 | 0 | 0.06 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
Lead time and procurement
Lead time 48 ± 19 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 26 May 2026 | Low | PX_KT-397A | Follow up after steam upset KT-397A |
| 16 May 2026 | Medium | PX_KT-397A | Replace lamp as per PM finding |
| 14 May 2026 | Low | PX_KT-397A | KT-397A trip test |
| 13 May 2026 | Low | PX_KT-447 | KT-447 trip test |
| 19 Apr 2026 | Low | PX_KT-447 | Follow up after steam upset KT-447 |
| 02 Apr 2026 | Medium | PX_KT-397A | Follow up after steam upset KT-397A |
| 30 Mar 2026 | Low | PX_KT-447 | Leak from packing |
| 28 Mar 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
Recent goods issues
Never issued in the 17-month history.