SOLENOID VALVE,TYPE CI467,NBR

Material 4100052125 · SOLENOID VALVE · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100052125
Category
SOLENOID VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 5 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
48 d · P80 97 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 7.0 EA/year: 7.0 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~48 days; expected demand during lead time 0.9.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
  • 5.On hand 3 + on order 0 is at or below the reorder point: order 7 now.
  • 6.Installed on 5 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 79.0M · order by 01 Oct 2026
Expected arrival ≈ 48 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
99.9%
stockout risk now 8%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 280 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 5 functional locations

1 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_SDV-844
BF-109 SHUTDOWN VALVE
S200.06
PX_SDV-948C
HE-1091 SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 48 ± 19 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
11 Jun 2026LowPX_KT-264ALeak from packing
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
13 May 2026LowPX_KT-447KT-447 trip test
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
19 Apr 2026LowPX_KT-447Follow up after steam upset KT-447
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A

Recent goods issues

Posting dateQtyOrderOrder type
25 Dec 20252201000005353Corrective