SOLENOID VALVE,MODEL ND561,VITON

Material 4100052167 · SOLENOID VALVE · Plant 1000

ASafety-criticalReorderCriticalInsurance gap
Material
4100052167
Category
SOLENOID VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
No PO history
Lead time
48 d · P80 97 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~48 days; expected demand during lead time 0.0.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 6.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 22.6M · order by 01 Oct 2026
Expected arrival ≈ 48 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
10 / 14
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 2%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 136.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 5 functional locations

3 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_SDV-1829
ON-OFF VALVE
A100.06
PX_SDV-1988
HE-632B SHUTDOWN VALVE
B400.06
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_SDV-741B
PP-1752A SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 48 ± 19 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Never issued in the 17-month history.