SOLENOID VALVE,SIZE CP742,NBR
Material 4100052268 · SOLENOID VALVE · Plant 1000
ASafety-criticalReduceNon-moving
- Material
- 4100052268
- Category
- SOLENOID VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 4 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 48 d · P80 97 d
- Unit price
- Rp 11.3M (est.)
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~48 days; expected demand during lead time 0.0.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 5.Stock 5 exceeds the level to keep (2) by 3.
- 6.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 238.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.
Installed on 4 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
| PX_SDV-1848 HE-1348 SHUTDOWN VALVE | S | 1 | 2 | 0.06 |
| PY_SDV-1319 ON-OFF VALVE | S | 1 | 1 | 0.48 |
Lead time and procurement
Lead time 48 ± 19 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Sept 2026 | Low | PX_SDV-1848 | Install scaffolding at SDV-1848 |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 13 May 2026 | Low | PX_KT-447 | KT-447 trip test |
| 19 Apr 2026 | Low | PX_KT-447 | Follow up after steam upset KT-447 |
| 30 Mar 2026 | Low | PX_KT-447 | Leak from packing |
| 28 Mar 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 14 Mar 2026 | Medium | PX_KT-447 | KT-447 steam leak at gland |
| 14 Jan 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 21 Nov 2025 | Medium | PX_KT-447 | Leak from packing |
Recent goods issues
Never issued in the 17-month history.