SOLENOID VALVE,SIZE CP742,NBR

Material 4100052268 · SOLENOID VALVE · Plant 1000

ASafety-criticalReduceNon-moving
Material
4100052268
Category
SOLENOID VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 4 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
48 d · P80 97 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~48 days; expected demand during lead time 0.0.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.Stock 5 exceeds the level to keep (2) by 3.
  • 6.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 238.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_SDV-1848
HE-1348 SHUTDOWN VALVE
S120.06
PY_SDV-1319
ON-OFF VALVE
S110.48

Lead time and procurement

Lead time 48 ± 19 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Sept 2026LowPX_SDV-1848Install scaffolding at SDV-1848
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
13 May 2026LowPX_KT-447KT-447 trip test
19 Apr 2026LowPX_KT-447Follow up after steam upset KT-447
30 Mar 2026LowPX_KT-447Leak from packing
28 Mar 2026MediumPX_KT-447Follow up after steam upset KT-447
14 Mar 2026MediumPX_KT-447KT-447 steam leak at gland
14 Jan 2026MediumPX_KT-447Follow up after steam upset KT-447
21 Nov 2025MediumPX_KT-447Leak from packing

Recent goods issues

Never issued in the 17-month history.