Sparely
DU

SOLENOID VALVE,TYPE NE131,A182F11

Material 4100052392 · SOLENOID VALVE · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100052392
Category
SOLENOID VALVE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
SAMUDRA UTAMA GLOBAL PT
Lead time
68 d · P80 97 d
Unit price
Rp 6.6M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~68 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 6.Long lead time: 80% of deliveries took up to 97 days and the fastest seen in its category 35 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 19.7M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 13%
Unit price
Rp 6.6M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 289 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 557.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_SDV-949
VD-1618 SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 68 ± 19 days (PO history + category, 1 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
14 Dec 2025PR05
Project / turnaround
2Rp 6.6M19 Apr 2026126 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
27 Jul 2025MediumPX_KT-460BFollow up after steam upset KT-460B

Recent goods issues

Posting dateQtyOrderOrder type
16 Dec 20251201000012406Corrective