SOLENOID VALVE,MODEL KO32,SS316
Material 4100052431 · SOLENOID VALVE · Plant 1000
BSafety-criticalLong-leadReorderNormalBelow reorder point
- Material
- 4100052431
- Category
- SOLENOID VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 3 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 60 d · P80 97 d
- Unit price
- Rp 7.2M
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 4.6 EA/year: 4.6 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~60 days; expected demand during lead time 0.8.
- 4.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 9.
- 5.On hand 3 + on order 2 is at or below the reorder point: order 4 now.
- 6.Long lead time: 80% of deliveries took up to 97 days and the fastest seen in its category 35 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 28.9M · order by 01 Oct 2026
Expected arrival ≈ 60 days
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
3 / 2
next delivery 15 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
9
order qty 4
Service level
99.6%
stockout risk now 0%
Unit price
Rp 7.2M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 118 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_SDV-1880B ON-OFF VALVE | B | 1 | 1 | 0.06 |
| PX_SDV-960 GASOLINE ISOLATION | B | 1 | 0 | 0.06 |
| PX_KT-383A TURBINE FOR KC-383A | S | 1 | 7 | 3.67 |
Lead time and procurement
Lead time 60 ± 19 days (PO history + category, 2 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 06 Jul 2026 | PR03 Regular replenishment | 2 | Rp 7.1M | 15 Oct 2026 open | 101 d |
| 25 May 2025 | PR06 Regular replenishment | 2 | Rp 7.4M | 17 Jul 2025 | 53 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 23 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 19 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 24 May 2026 | High | PX_KT-383A | KT-383A steam leak at gland |
| 23 Jun 2025 | Medium | PX_KT-383A | KT-383A governor valve hunting |
| 13 May 2025 | Medium | PX_SDV-1880B | Check SDV-1880B.ok |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 05 Jun 2026 | 2 | 201000005500 | Corrective |
| 04 Jun 2026 | 3 | 201000005500 | Corrective |