Sparely
DU

SOLENOID VALVE,MODEL QS332,NBR

Material 4100052436 · SOLENOID VALVE · Plant 1000

ASafety-criticalLong-leadReduceSlow-moving
Material
4100052436
Category
SOLENOID VALVE
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 5 FuncLocs A/B, 5 safety/shutdown valve)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
73 d · P80 97 d
Unit price
Rp 12.3M

Recommendation

  • 1.Safety-critical element: installed on 5 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~73 days; expected demand during lead time 0.1.
  • 4.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.Stock 3 exceeds the level to keep (2) by 1.
  • 6.Long lead time: 80% of deliveries took up to 97 days and the fastest seen in its category 35 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 12.3M
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 422 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 281.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 5 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-1866
ON-OFF VALVE
A100.06
PY_SDV-395A
ON-OFF VALVE
A100.06
PX_SDV-1052
VD-687 SHUTDOWN VALVE
S100.06
PX_SDV-1151
ON-OFF VALVE
S100.06
PX_SDV-1627B
FUEL OIL ISOLATION
S100.06

Lead time and procurement

Lead time 73 ± 19 days (PO history + category, 2 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
25 Apr 2026PR06
Regular replenishment
1Rp 11.9M10 Jun 202646 d
24 Mar 2026PR06
Regular replenishment
2Rp 12.7M13 Sept 2026173 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
05 Aug 20251201000002924Corrective
04 Aug 20251201000002924Corrective