SOLENOID VALVE,SIZE FG705,GRAPHITE
Material 4100052805 · SOLENOID VALVE · Plant 1000
BSafety-criticalLong-leadMonitorSlow-moving
- Material
- 4100052805
- Category
- SOLENOID VALVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- GUNUNG UTAMA LESTARI PT
- Lead time
- 49 d · P80 97 d
- Unit price
- Rp 12.6M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~49 days; expected demand during lead time 0.2.
- 4.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 5.Long lead time: 80% of deliveries took up to 97 days and the fastest seen in its category 35 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.6%
stockout risk now 0%
Unit price
Rp 12.6M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 378 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 493.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_SDV-1427 CL-899 SHUTDOWN VALVE | B | 1 | 4 | 1.34 |
Lead time and procurement
Lead time 49 ± 19 days (PO history + category, 1 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Jul 2026 | PR03 Regular replenishment | 1 | Rp 12.6M | 01 Sept 2026 | 51 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Sept 2026 | Emergency | PX_SDV-1427 | Painting SDV-1427 |
| 07 May 2026 | Medium | PX_SDV-1427 | [MSI-B-26-MUF-213] Permanent repair |
| 14 Apr 2026 | Medium | PX_SDV-1427 | Replace lamp as per PM finding |
| 28 Jul 2025 | Low | PX_SDV-1427 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Sept 2025 | 3 | 201000039916 | Corrective |
| 17 Sept 2025 | 1 | 201000039916 | Corrective |