Sparely
DU

SOLENOID VALVE,SIZE AX247,GRAPHITE

Material 4100053556 · SOLENOID VALVE · Plant 1000

SSafety-criticalReorderCriticalStockout
Material
4100053556
Category
SOLENOID VALVE
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
48 d · P80 97 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~48 days; expected demand during lead time 0.0.
  • 4.A 98.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
Proposed purchase requisition
1 EA
Rp 11.3M · order by 01 Oct 2026
Expected arrival ≈ 48 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.4%
stockout risk now 2%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 422 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 90.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~35 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-1869
ON-OFF VALVE
S100.06

Lead time and procurement

Lead time 48 ± 19 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
05 Aug 20251201000027512Corrective