SWITCH,LIMIT,MODEL LY687,GRAPHITE
Material 4100053594 · SWITCH · Plant 1000
ASafety-criticalLong-leadReorderCriticalStockout
- Material
- 4100053594
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (18 of 44 FuncLocs A/B, 31 safety/shutdown valve)
- Supplier
- SINAR SEJAHTERA LESTARI PT
- Lead time
- 72 d · P80 107 d
- Unit price
- Rp 6.9M
Recommendation
- 1.Safety-critical element: installed on 31 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 4.5 EA/year: 4.5 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~72 days; expected demand during lead time 0.9.
- 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
- 6.Long lead time: 80% of deliveries took up to 107 days and the fastest seen in its category 32 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 7.Installed on 44 FuncLoc(s), 18 of them criticality A/B.
- 8.ML early warning: 32% probability of demand in the next 90 days.
Proposed purchase requisition
10 EA
Rp 69.1M · order by 01 Oct 2026
Expected arrival ≈ 72 days
Safety-critical (SCE)Long-leadML early warningConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
99.8%
stockout risk now 39%
Unit price
Rp 6.9M
PO history
ML early warning: 32% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 218 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 44 functional locations
18 with criticality A/B · 56 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_MOV-1108 MOTOR OPERATED GATE VALVE | A | 4 | 1 | 0.06 |
| PX_SDV-1018B VD-1239 SHUTDOWN VALVE | A | 1 | 1 | 0.06 |
| PX_SDV-1463B SLOP OIL ISOLATION | A | 1 | 1 | 0.06 |
| PX_MOV-720 MOTOR OPERATED GATE VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-1660 ON-OFF VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-1866 ON-OFF VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-1929A VD-890A SHUTDOWN VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-626B VD-534A SHUTDOWN VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-958 CL-1833 SHUTDOWN VALVE | A | 1 | 0 | 0.06 |
| PX_MOV-1875 MOTOR OPERATED GATE VALVE | B | 1 | 0 | 0.06 |
| PX_MOV-903A MOTOR OPERATED GATE VALVE | B | 1 | 0 | 0.06 |
| PX_PP-1536B-CSS CONTROL SWITCH STATION FOR PP-1536B-M | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 72 ± 33 days (PO history, 3 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Mar 2026 | PR05 Project / turnaround | 3 | Rp 6.8M | 11 Jul 2026 | 112 d |
| 19 Feb 2026 | PR06 Regular replenishment | 2 | Rp 7.0M | 29 May 2026 | 99 d |
| 15 Sept 2025 | PR03 Regular replenishment | 2 | Rp 6.9M | 25 Oct 2025 | 40 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Jun 2026 | Medium | PX_SDV-398A | SDV-398A fail to close |
| 06 Jun 2026 | Medium | PX_SDV-1594 | Leak from packing |
| 23 Nov 2025 | High | PX_SDV-1594 | SDV-1594 limit switch faulty |
| 13 Aug 2025 | Medium | PX_SDV-200A | Painting SDV-200A |
| 04 Jul 2025 | Medium | PX_SDV-200A | SDV-200A solenoid burnt |
| 02 Jul 2025 | Medium | PX_PP-577-CSS | Install cover plate for MCP cracking |
| 12 Jun 2025 | Medium | PX_SDV-398A | Leak from packing |
| 02 Jun 2025 | Medium | PX_SDV-1594 | Painting SDV-1594 |
| 31 May 2025 | Low | PX_SDV-517 | Leak from packing |
| 22 May 2025 | Medium | PX_MOV-1108 | Install scaffolding at MOV-1108 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Feb 2026 | 2 | 205000021109 | Other maintenance |
| 10 Jan 2026 | 2 | 201000030076 | Corrective |
| 08 Dec 2025 | 3 | 201000028486 | Corrective |
| 04 Aug 2025 | 1 | 201000033732 | Corrective |
| 09 Jul 2025 | 1 | 201000018471 | Corrective |