SWITCH,LIMIT,TYPE YT834,PTFE
Material 4100053645 · SWITCH · Plant 1000
ASafety-criticalReduceExcess
- Material
- 4100053645
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 24 FuncLocs A/B, 19 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 60 d · P80 112 d
- Unit price
- Rp 6.0M (est.)
Recommendation
- 1.Safety-critical element: installed on 19 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 6.1 EA/year: 6.1 unplanned (recency-weighted compound poisson (own history)).
- 3.Lead time ~60 days; expected demand during lead time 1.0.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
- 5.Stock 170 exceeds the level to keep (10) by 160.
- 6.Installed on 24 FuncLoc(s), 8 of them criticality A/B.
- 7.ML early warning: 55% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningPrice estimatedLead time estimated
On hand / on order
170 / 0
no open PO
Today Min / Max
4 / 8
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 6.0M
Category + unit estimate
ML early warning: 55% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 77 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 24 functional locations
8 with criticality A/B · 32 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_SDV-124 DILUTION STEAM ISOLATION | A | 1 | 0 | 0.06 |
| PX_SDV-1313 ON-OFF VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-259 PP-273A SHUTDOWN VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-626B VD-534A SHUTDOWN VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-1427 CL-899 SHUTDOWN VALVE | B | 1 | 4 | 1.34 |
| PX_PP-436A-CSS CONTROL SWITCH STATION FOR PP-436A-M | B | 1 | 1 | 0.19 |
| PX_MOV-1696 MOTOR OPERATED GATE VALVE | B | 1 | 0 | 0.06 |
| PY_MOV-810 MOTOR OPERATED GATE VALVE | B | 1 | 0 | 0.06 |
| PX_MOV-979A MOTOR OPERATED GATE VALVE | C | 1 | 0 | 0.06 |
| PX_PP-942D-CSS CONTROL SWITCH STATION FOR PP-942D-M | C | 1 | 0 | 0.19 |
| PX_SDV-1127 ON-OFF VALVE | C | 4 | 0 | 0.06 |
| PX_SDV-1850 ON-OFF VALVE | C | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 60 ± 27 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | Medium | PX_SDV-535A | Check SDV-535A.ok |
| 08 Sept 2026 | Emergency | PX_SDV-1427 | Painting SDV-1427 |
| 07 May 2026 | Medium | PX_SDV-1427 | [MSI-B-26-MUF-213] Permanent repair |
| 14 Apr 2026 | Medium | PX_SDV-1427 | Replace lamp as per PM finding |
| 29 Jan 2026 | Low | PX_SDV-535A | SDV-535A limit switch faulty |
| 28 Jul 2025 | Low | PX_SDV-1427 | Leak from packing |
| 06 Jun 2025 | Medium | PX_SDV-1195 | SDV-1195 limit switch faulty |
| 29 May 2025 | Medium | PX_SDV-253 | SDV-253 limit switch faulty |
| 23 May 2025 | Medium | PX_PP-436A-CSS | PSM25/Replace lamp as per PM finding |
| 16 May 2025 | Low | PX_SDV-1086 | Check SDV-1086.ok |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Jul 2026 | 1 | 201000037405 | Corrective |
| 15 Jul 2026 | 1 | 201000037405 | Corrective |
| 02 May 2026 | 2 | 201000024330 | Corrective |
| 28 Jan 2026 | 1 | 201000014252 | Corrective |
| 08 Jan 2026 | 1 | 201000000634 | Corrective |
| 20 Dec 2025 | 1 | 201000023844 | Corrective |
| 14 Oct 2025 | 1 | 201000010345 | Corrective |
| 21 Sept 2025 | 1 | 201000022319 | Corrective |
| 20 Sept 2025 | 1 | 201000022319 | Corrective |