SWITCH,LIMIT,TYPE HA130,VITON
Material 4100053647 · SWITCH · Plant 1000
ASafety-criticalReorderCriticalStockout
- Material
- 4100053647
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (6 of 16 FuncLocs A/B, 12 safety/shutdown valve)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 69 d · P80 79 d
- Unit price
- Rp 2.5M
Recommendation
- 1.Safety-critical element: installed on 12 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~69 days; expected demand during lead time 0.4.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
- 6.Installed on 16 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 15.0M · order by 01 Oct 2026
Expected arrival ≈ 69 days
Safety-critical (SCE)Convert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 16%
Unit price
Rp 2.5M
PO history
ML early warning: 24% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 290 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 639.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 16 functional locations
6 with criticality A/B · 20 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_MOV-942A MOTOR OPERATED GATE VALVE | A | 1 | 0 | 0.06 |
| PX_PP-1752A-CSS CONTROL SWITCH STATION FOR PP-1752A-M | A | 1 | 0 | 0.19 |
| PX_SDV-114 ON-OFF VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-1929A VD-890A SHUTDOWN VALVE | A | 1 | 0 | 0.06 |
| PX_MOV-1517A MOTOR OPERATED GATE VALVE | B | 4 | 0 | 0.06 |
| PX_SDV-742A METHANOL ISOLATION | B | 1 | 0 | 0.06 |
| PX_PP-807B-CSS CONTROL SWITCH STATION FOR PP-807B-M | C | 1 | 0 | 0.19 |
| PX_SDV-1588B HE-1180D SHUTDOWN VALVE | C | 1 | 0 | 0.06 |
| PX_SDV-272B COOLING WATER ISOLATION | C | 1 | 0 | 0.06 |
| PX_SDV-869 ON-OFF VALVE | C | 1 | 0 | 0.06 |
| PX_SDV-1729 LUBE OIL ISOLATION | S | 1 | 1 | 0.06 |
| PX_SDV-1213 ON-OFF VALVE | S | 2 | 0 | 0.06 |
Lead time and procurement
Lead time 69 ± 15 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Dec 2025 | PR06 Regular replenishment | 3 | Rp 2.5M | 27 Feb 2026 | 80 d |
| 10 Nov 2025 | PR04 Regular (other) | 1 | Rp 2.5M | 26 Jan 2026 | 77 d |
| 08 Aug 2025 | PR06 Regular replenishment | 2 | Rp 2.4M | 21 Oct 2025 | 74 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 May 2025 | Low | PX_SDV-1729 | Check SDV-1729.ok |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Dec 2025 | 2 | 201000009616 | Corrective |
| 26 Aug 2025 | 1 | 201000037542 | Corrective |
| 25 Aug 2025 | 2 | 201000037542 | Corrective |
| 25 Aug 2025 | 1 | 201000037542 | Corrective |