Material 4100053647 · SWITCH · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100053647
Category
SWITCH
Base unit
EA
MRP type
Non Stock
Criticality
A (6 of 16 FuncLocs A/B, 12 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
69 d · P80 79 d
Unit price
Rp 2.5M

Recommendation

  • 1.Safety-critical element: installed on 12 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~69 days; expected demand during lead time 0.4.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 6.Installed on 16 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 15.0M · order by 01 Oct 2026
Expected arrival ≈ 69 days
Safety-critical (SCE)Convert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 16%
Unit price
Rp 2.5M
PO history
ML early warning: 24% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 290 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 639.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.

Installed on 16 functional locations

6 with criticality A/B · 20 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_MOV-942A
MOTOR OPERATED GATE VALVE
A100.06
PX_PP-1752A-CSS
CONTROL SWITCH STATION FOR PP-1752A-M
A100.19
PX_SDV-114
ON-OFF VALVE
A100.06
PX_SDV-1929A
VD-890A SHUTDOWN VALVE
A100.06
PX_MOV-1517A
MOTOR OPERATED GATE VALVE
B400.06
PX_SDV-742A
METHANOL ISOLATION
B100.06
PX_PP-807B-CSS
CONTROL SWITCH STATION FOR PP-807B-M
C100.19
PX_SDV-1588B
HE-1180D SHUTDOWN VALVE
C100.06
PX_SDV-272B
COOLING WATER ISOLATION
C100.06
PX_SDV-869
ON-OFF VALVE
C100.06
PX_SDV-1729
LUBE OIL ISOLATION
S110.06
PX_SDV-1213
ON-OFF VALVE
S200.06

Lead time and procurement

Lead time 69 ± 15 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
09 Dec 2025PR06
Regular replenishment
3Rp 2.5M27 Feb 202680 d
10 Nov 2025PR04
Regular (other)
1Rp 2.5M26 Jan 202677 d
08 Aug 2025PR06
Regular replenishment
2Rp 2.4M21 Oct 202574 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 May 2025LowPX_SDV-1729Check SDV-1729.ok

Recent goods issues

Posting dateQtyOrderOrder type
15 Dec 20252201000009616Corrective
26 Aug 20251201000037542Corrective
25 Aug 20252201000037542Corrective
25 Aug 20251201000037542Corrective