SWITCH,LIMIT,TYPE XO955,A182F11
Material 4100053698 · SWITCH · Plant 1000
ASafety-criticalMonitorCritical insurance spare
- Material
- 4100053698
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (6 of 9 FuncLocs A/B, 6 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 60 d · P80 112 d
- Unit price
- Rp 6.0M (est.)
Recommendation
- 1.Safety-critical element: installed on 6 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~60 days; expected demand during lead time 0.0.
- 4.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.1%
stockout risk now 1%
Unit price
Rp 6.0M
Category + unit estimate
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 37.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 9 functional locations
6 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_SDV-1443B RECYCLE ETHANE ISOLATION | A | 1 | 2 | 0.48 |
| PX_SDV-1353A FEED ISOLATION | A | 1 | 1 | 0.06 |
| PX_SDV-105 METHANOL ISOLATION | A | 1 | 0 | 0.06 |
| PX_PP-423A-CSS CONTROL SWITCH STATION FOR PP-423A-M | B | 1 | 0 | 0.19 |
| PX_PP-745-CSS CONTROL SWITCH STATION FOR PP-745-M | B | 1 | 0 | 0.19 |
| PX_SDV-1113 PP-1543 SHUTDOWN VALVE | B | 1 | 0 | 0.06 |
| PX_PP-1838D-CSS CONTROL SWITCH STATION FOR PP-1838D-M | C | 1 | 0 | 0.19 |
| PX_SDV-1160 HE-1482D SHUTDOWN VALVE | S | 1 | 0 | 0.06 |
| PY_SDV-748 BFW ISOLATION | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 60 ± 27 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Low | PY_SDV-1443B | Repair insulation SDV-1443B |
| 17 Jul 2025 | Medium | PX_SDV-1353A | Install scaffolding at SDV-1353A |
| 12 May 2025 | Medium | PY_SDV-1443B | SDV-1443B fail to close |
Recent goods issues
Never issued in the 17-month history.