SWITCH,LIMIT,SIZE AJ745,GRAPHITE

Material 4100053718 · SWITCH · Plant 1000

BSafety-criticalReduceExcess
Material
4100053718
Category
SWITCH
Base unit
EA
MRP type
Stock Item
Criticality
B (4 of 10 FuncLocs A/B, 6 safety/shutdown valve)
Supplier
SURYA ENERGI JAYA PT
Lead time
47 d · P80 50 d
Unit price
Rp 13.4M

Recommendation

  • 1.Safety-critical element: installed on 6 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.0 EA/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~47 days; expected demand during lead time 0.3.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 5.Stock 13 exceeds the level to keep (9) by 4; the level includes the 9 used in the last turnaround.
  • 6.Installed on 10 FuncLoc(s), 4 of them criticality A/B.
  • 7.ML early warning: 44% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 9Single sourceOpen PO
On hand / on order
13 / 8
next delivery 12 Oct 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 13.4M
PO history
ML early warning: 44% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 118 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (9 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.

Installed on 10 functional locations

4 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-1880B
ON-OFF VALVE
B110.06
PX_MOV-903A
MOTOR OPERATED GATE VALVE
B300.06
PX_SDV-1467A
VD-1378 SHUTDOWN VALVE
B100.06
PX_SDV-526
VD-219 SHUTDOWN VALVE
B100.06
PX_PP-1101A-CSS
CONTROL SWITCH STATION FOR PP-1101A-M
C100.19
PX_PP-118B-CSS
CONTROL SWITCH STATION FOR PP-118B-M
C100.19
PY_MOV-1817B
MOTOR OPERATED GATE VALVE
C100.06
PY_SDV-1319
ON-OFF VALVE
S110.48
PX_SDV-1916A
HE-395B SHUTDOWN VALVE
S100.06
PX_SDV-641A
ON-OFF VALVE
S300.06

Lead time and procurement

Lead time 47 ± 17 days (PO history, 5 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
17 Sept 2026PR06
Regular replenishment
8Rp 14.2M12 Oct 2026
open
25 d
05 May 2026PR06
Regular replenishment
4Rp 13.5M24 Jun 202650 d
01 Apr 2026PR06
Regular replenishment
3Rp 13.2M22 May 202651 d
02 Sept 2025PR03
Regular replenishment
9Rp 13.2M04 Oct 202532 d
17 Jul 2025PR03
Regular replenishment
9Rp 13.4M23 Aug 202537 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Jun 2025MediumPY_SDV-1319SDV-1319 solenoid burnt
13 May 2025MediumPX_SDV-1880BCheck SDV-1880B.ok

Recent goods issues

Posting dateQtyOrderOrder type
05 Jun 20261201000005500Corrective
28 Dec 20251201000019016Corrective
20 Dec 20252201000038011Corrective
10 Nov 20251203000004034Turnaround
09 Nov 20253203000004034Turnaround
07 Nov 20252203000004034Turnaround
07 Nov 20251203000004034Turnaround
06 Nov 20252203000004034Turnaround