SWITCH,LIMIT,SIZE QE16,INCOLOY
Material 4100053729 · SWITCH · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100053729
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (6 of 13 FuncLocs A/B, 6 safety/shutdown valve)
- Supplier
- KARYA SARANA GLOBAL PT
- Lead time
- 52 d · P80 59 d
- Unit price
- Rp 13.2M
Recommendation
- 1.Safety-critical element: installed on 6 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 3.9 EA/year: 3.9 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~52 days; expected demand during lead time 0.6.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
- 5.On hand 1 + on order 0 is at or below the reorder point: order 7 now.
- 6.Installed on 13 FuncLoc(s), 6 of them criticality A/B.
- 7.ML early warning: 33% probability of demand in the next 90 days.
Proposed purchase requisition
7 EA
Rp 92.4M · order by 01 Oct 2026
Expected arrival ≈ 52 days
Safety-critical (SCE)ML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
8
order qty 3
Service level
100.0%
stockout risk now 30%
Unit price
Rp 13.2M
PO history
ML early warning: 33% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 162 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 13 functional locations
6 with criticality A/B · 18 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_SDV-1443B RECYCLE ETHANE ISOLATION | A | 1 | 2 | 0.48 |
| PX_SDV-177C ON-OFF VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-768C FEED ISOLATION | A | 1 | 0 | 0.06 |
| PX_SDV-889 ETHYLENE ISOLATION | A | 1 | 0 | 0.06 |
| PX_PP-1428A-CSS CONTROL SWITCH STATION FOR PP-1428A-M | B | 1 | 0 | 0.19 |
| PX_PP-1657A-CSS CONTROL SWITCH STATION FOR PP-1657A-M | B | 4 | 0 | 0.19 |
| PX_PP-744B-CSS CONTROL SWITCH STATION FOR PP-744B-M | C | 1 | 1 | 0.19 |
| PX_PP-1785A-CSS CONTROL SWITCH STATION FOR PP-1785A-M | C | 3 | 0 | 0.19 |
| PX_PP-483B-CSS CONTROL SWITCH STATION FOR PP-483B-M | C | 1 | 0 | 0.19 |
| PX_PP-795D-CSS CONTROL SWITCH STATION FOR PP-795D-M | C | 1 | 0 | 0.19 |
| PX_PP-807B-CSS CONTROL SWITCH STATION FOR PP-807B-M | C | 1 | 0 | 0.19 |
| PX_SDV-1359A PP-1337 SHUTDOWN VALVE | S | 1 | 1 | 0.06 |
Lead time and procurement
Lead time 52 ± 21 days (PO history, 4 PO lines) · on-time 18%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 May 2026 | PR03 Regular replenishment | 4 | Rp 13.4M | 26 Jul 2026 | 63 d |
| 03 Feb 2026 | PR03 Regular replenishment | 4 | Rp 13.7M | 19 Mar 2026 | 44 d |
| 25 Jan 2026 | PR01 Import / long-lead | 3 | Rp 12.7M | 22 Mar 2026 | 56 d |
| 30 Dec 2025 | PR03 Regular replenishment | 4 | Rp 13.0M | 22 Jan 2026 | 23 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Low | PY_SDV-1443B | Repair insulation SDV-1443B |
| 15 Jul 2025 | High | PX_SDV-445 | SDV-445 limit switch faulty |
| 22 May 2025 | Medium | PX_PP-744B-CSS | Replace lamp as per PM finding |
| 12 May 2025 | Medium | PY_SDV-1443B | SDV-1443B fail to close |
| 03 May 2025 | Medium | PX_SDV-1359A | SDV-1359A limit switch faulty |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Apr 2026 | 2 | 201000039223 | Corrective |
| 19 Dec 2025 | 3 | 201000008276 | Corrective |
| 18 Dec 2025 | 1 | 201000008276 | Corrective |
| 16 Dec 2025 | 1 | 201000009616 | Corrective |
| 14 Dec 2025 | 1 | 201000000570 | Corrective |