Sparely
DU

SWITCH,LIMIT,TYPE CQ817,INCOLOY

Material 4100053803 · SWITCH · Plant 1000

BSafety-criticalLong-leadReorderNormalBelow reorder point
Material
4100053803
Category
SWITCH
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 4 FuncLocs A/B, 4 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
54 d · P80 112 d
Unit price
Rp 4.0M

Recommendation

  • 1.Safety-critical element: installed on 4 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~54 days; expected demand during lead time 0.2.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
  • 6.Long lead time: 80% of deliveries took up to 112 days and the fastest seen in its category 32 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 8.1M · order by 01 Oct 2026
Expected arrival ≈ 54 days
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 4.0M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 86 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 703.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.

Installed on 4 functional locations

1 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-1730
GASOLINE ISOLATION
B100.06
PX_SDV-1568A
HYDROGEN ISOLATION
S120.48
PX_SDV-569
ON-OFF VALVE
S100.06
PX_SDV-997B
VD-1552A SHUTDOWN VALVE
S200.06

Lead time and procurement

Lead time 54 ± 27 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
13 Jun 2025PR03
Regular replenishment
1Rp 4.0M11 Aug 202559 d
30 May 2025PR06
Regular replenishment
1Rp 4.1M01 Jul 202532 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Dec 2025MediumPX_SDV-1568A[MSI-B-25-UEB-389] Permanent repair
17 May 2025LowPX_SDV-1568AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
07 Jul 20261201000002411Corrective
18 Jan 20261201000008375Corrective