Sparely
DU

SWITCH,LIMIT,TYPE MV248,MONEL

Material 4100053827 · SWITCH · Plant 1000

ASafety-criticalLong-leadReduceSlow-moving
Material
4100053827
Category
SWITCH
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 7 FuncLocs A/B, 7 safety/shutdown valve)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
61 d · P80 112 d
Unit price
Rp 8.9M

Recommendation

  • 1.Safety-critical element: installed on 7 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~61 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 5.Stock 48 exceeds the level to keep (3) by 45.
  • 6.Long lead time: 80% of deliveries took up to 112 days and the fastest seen in its category 32 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 7 FuncLoc(s), 5 of them criticality A/B.
Safety-critical (SCE)Long-leadSingle source
On hand / on order
48 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 8.9M
PO history
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 322 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 494.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.

Installed on 7 functional locations

5 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-797A
VD-125 SHUTDOWN VALVE
A100.06
PX_SDV-513
HYDROGEN ISOLATION
B100.06
PX_SDV-668
LUBE OIL ISOLATION
B100.06
PY_SDV-695
ON-OFF VALVE
B100.06
PY_SDV-871
ON-OFF VALVE
B100.06
PX_SDV-1599
PP-389 SHUTDOWN VALVE
S100.06
PX_SDV-900A
ON-OFF VALVE
S100.06

Lead time and procurement

Lead time 61 ± 27 days (PO history + category, 1 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
26 Jul 2026PR06
Regular replenishment
2Rp 8.9M29 Sept 202665 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
13 Nov 20251206000019278Other maintenance
04 Sept 20251201000037360Corrective
13 Jun 20251201000030319Corrective