SWITCH,LIMIT,TYPE NT140,NBR
Material 4100053848 · SWITCH · Plant 1000
CSafety-criticalMonitorStockout
- Material
- 4100053848
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 4 FuncLocs A/B, 3 safety/shutdown valve)
- Supplier
- LANGIT TEKNOLOGI PERSADA PT
- Lead time
- 84 d · P80 84 d
- Unit price
- Rp 12.5M
Recommendation
- 1.Safety-critical element: installed on 3 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~84 days; expected demand during lead time 0.2.
- 4.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 5.ML early warning: 30% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningConvert to Stock ItemLast turnaround used 1Single sourceOpen PO
On hand / on order
0 / 3
next delivery 06 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.6%
stockout risk now 0%
Unit price
Rp 12.5M
PO history
ML early warning: 30% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 371 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 284.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 4 functional locations
0 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_MOV-1302 MOTOR OPERATED GATE VALVE | C | 1 | 0 | 0.06 |
| PX_SDV-355 ON-OFF VALVE | S | 1 | 0 | 0.06 |
| PX_SDV-643 PP-610B SHUTDOWN VALVE | S | 1 | 0 | 0.06 |
| PX_SDV-842 HE-785C SHUTDOWN VALVE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 84 ± 61 days (PO history, 6 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Sept 2026 | PR06 Regular replenishment | 2 | Rp 12.3M | 06 Nov 2026 open | 55 d |
| 06 Aug 2026 | PR06 Regular replenishment | 1 | Rp 12.2M | 06 Oct 2026 open | 61 d |
| 06 Dec 2025 | PR06 Regular replenishment | 2 | Rp 12.5M | 31 Jan 2026 | 56 d |
| 28 Nov 2025 | PR06 Regular replenishment | 1 | Rp 12.5M | 05 Feb 2026 | 69 d |
| 19 Sept 2025 | PR06 Regular replenishment | 1 | Rp 12.7M | 30 May 2026 | 253 d |
| 10 Jul 2025 | PR06 Regular replenishment | 2 | Rp 13.2M | 02 Oct 2025 | 84 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Nov 2025 | 1 | 203000014368 | Turnaround |
| 25 Sept 2025 | 2 | 201000002741 | Corrective |
| 25 Sept 2025 | 1 | 201000027978 | Corrective |
| 25 Aug 2025 | 1 | 201000011450 | Corrective |