SWITCH,LIMIT,TYPE IV452,NBR

Material 4100053937 · SWITCH · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100053937
Category
SWITCH
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 6 FuncLocs A/B, 5 safety/shutdown valve)
Supplier
No PO history
Lead time
60 d · P80 112 d
Unit price
Rp 6.0M (est.)

Recommendation

  • 1.Safety-critical element: installed on 5 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~60 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
  • 6.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 6.0M · order by 01 Oct 2026
Expected arrival ≈ 60 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 6.0M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 134 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 397.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.

Installed on 6 functional locations

3 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-336
METHANE ISOLATION
A110.48
PX_PP-103-CSS
CONTROL SWITCH STATION FOR PP-103-M
B100.19
PX_SDV-971
ON-OFF VALVE
B100.06
PX_SDV-1659
ON-OFF VALVE
S100.06
PX_SDV-656
HE-260B SHUTDOWN VALVE
S300.06
PX_SDV-741B
PP-1752A SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 60 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Jul 2025MediumPX_SDV-336Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
20 May 20261201000012434Corrective