Sparely
DU

SWITCH,LIMIT,MODEL EU665,SS304

Material 4100053941 · SWITCH · Plant 1000

ASafety-criticalMonitorSlow-moving
Material
4100053941
Category
SWITCH
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
54 d · P80 52 d
Unit price
Rp 4.4M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~54 days; expected demand during lead time 0.1.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 4.4M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 452 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 238.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_MOV-1108
MOTOR OPERATED GATE VALVE
A110.06
PX_PP-1369C-CSS
CONTROL SWITCH STATION FOR PP-1369C-M
C100.19
PX_SDV-357B
FLUSHING OIL ISOLATION
S100.06

Lead time and procurement

Lead time 54 ± 17 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
22 Nov 2025PR03
Regular replenishment
1Rp 4.4M07 Jan 202646 d
16 Sept 2025PR03
Regular replenishment
2Rp 4.5M29 Oct 202543 d
22 May 2025PR03
Regular replenishment
2Rp 4.3M17 Jul 202556 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 May 2025MediumPX_MOV-1108Install scaffolding at MOV-1108

Recent goods issues

Posting dateQtyOrderOrder type
06 Jul 20252201000026222Corrective
02 Jul 20252204000035120Preventive