SWITCH,LIMIT,MODEL EU665,SS304
Material 4100053941 · SWITCH · Plant 1000
ASafety-criticalMonitorSlow-moving
- Material
- 4100053941
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 54 d · P80 52 d
- Unit price
- Rp 4.4M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~54 days; expected demand during lead time 0.1.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 4.4M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 452 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 238.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 3 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_MOV-1108 MOTOR OPERATED GATE VALVE | A | 1 | 1 | 0.06 |
| PX_PP-1369C-CSS CONTROL SWITCH STATION FOR PP-1369C-M | C | 1 | 0 | 0.19 |
| PX_SDV-357B FLUSHING OIL ISOLATION | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 54 ± 17 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Nov 2025 | PR03 Regular replenishment | 1 | Rp 4.4M | 07 Jan 2026 | 46 d |
| 16 Sept 2025 | PR03 Regular replenishment | 2 | Rp 4.5M | 29 Oct 2025 | 43 d |
| 22 May 2025 | PR03 Regular replenishment | 2 | Rp 4.3M | 17 Jul 2025 | 56 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 May 2025 | Medium | PX_MOV-1108 | Install scaffolding at MOV-1108 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Jul 2025 | 2 | 201000026222 | Corrective |
| 02 Jul 2025 | 2 | 204000035120 | Preventive |