SWITCH,LIMIT,MODEL IQ56,VITON
Material 4100054008 · SWITCH · Plant 1000
- Material
- 4100054008
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 60 d · P80 112 d
- Unit price
- Rp 6.0M (est.)
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~60 days; expected demand during lead time 0.0.
- 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 5.Stock 6 exceeds the level to keep (2) by 4.
- 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_SDV-1526 CHARGE GAS ISOLATION | A | 1 | 0 | 0.06 |
| PX_PP-1024-CSS CONTROL SWITCH STATION FOR PP-1024-M | B | 1 | 0 | 0.19 |
| PX_SDV-748A CL-164 SHUTDOWN VALVE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 60 ± 27 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.