Material 4100054056 · SWITCH · Plant 1000

ASafety-criticalMonitorInsurance gap
Material
4100054056
Category
SWITCH
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 3 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
52 d · P80 58 d
Unit price
Rp 10.3M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~52 days; expected demand during lead time 0.0.
  • 4.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Single sourceOpen PO
On hand / on order
0 / 1
next delivery 28 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 10.3M
PO history
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 16.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_MOV-1918A
MOTOR OPERATED GATE VALVE
A110.48
PX_MOV-1302
MOTOR OPERATED GATE VALVE
C100.06
PX_SDV-949
VD-1618 SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 52 ± 27 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
14 Sept 2026PR03
Regular replenishment
1Rp 10.3M28 Nov 2026
open
75 d
22 Jan 2026PR06
Regular replenishment
1Rp 10.2M13 Feb 202622 d
01 Aug 2025PR06
Regular replenishment
1Rp 10.4M02 Sept 202532 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Aug 2025MediumPX_MOV-1918APSM25/MOV-1918A fail to open

Recent goods issues

Never issued in the 17-month history.