SWITCH,LIMIT,TYPE KM477,INCOLOY
Material 4100054056 · SWITCH · Plant 1000
ASafety-criticalMonitorInsurance gap
- Material
- 4100054056
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 3 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 52 d · P80 58 d
- Unit price
- Rp 10.3M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~52 days; expected demand during lead time 0.0.
- 4.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Single sourceOpen PO
On hand / on order
0 / 1
next delivery 28 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 10.3M
PO history
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 16.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 3 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_MOV-1918A MOTOR OPERATED GATE VALVE | A | 1 | 1 | 0.48 |
| PX_MOV-1302 MOTOR OPERATED GATE VALVE | C | 1 | 0 | 0.06 |
| PX_SDV-949 VD-1618 SHUTDOWN VALVE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 52 ± 27 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Sept 2026 | PR03 Regular replenishment | 1 | Rp 10.3M | 28 Nov 2026 open | 75 d |
| 22 Jan 2026 | PR06 Regular replenishment | 1 | Rp 10.2M | 13 Feb 2026 | 22 d |
| 01 Aug 2025 | PR06 Regular replenishment | 1 | Rp 10.4M | 02 Sept 2025 | 32 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Aug 2025 | Medium | PX_MOV-1918A | PSM25/MOV-1918A fail to open |
Recent goods issues
Never issued in the 17-month history.