SWITCH,LIMIT,SIZE KW758,A105
Material 4100054058 · SWITCH · Plant 1000
ASafety-criticalLong-leadMonitorSlow-moving
- Material
- 4100054058
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B, 3 safety/shutdown valve)
- Supplier
- ANUGRAH TEKNOLOGI INTERNASIONAL PT
- Lead time
- 99 d · P80 112 d
- Unit price
- Rp 3.0M
Recommendation
- 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~99 days; expected demand during lead time 0.1.
- 4.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 5.Long lead time: 80% of deliveries took up to 112 days and the fastest seen in its category 32 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
1 / 2
next delivery 12 Jan 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 3.0M
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 223 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 201.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_SDV-1973A VD-694 SHUTDOWN VALVE | A | 1 | 1 | 0.06 |
| PX_MOV-720 MOTOR OPERATED GATE VALVE | A | 1 | 0 | 0.06 |
| PX_SDV-145 PP-103 SHUTDOWN VALVE | S | 1 | 0 | 0.06 |
| PX_SDV-1554 ON-OFF VALVE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 99 ± 27 days (PO history + category, 2 PO lines) · on-time 23%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Aug 2026 | PR03 Regular replenishment | 2 | Rp 3.0M | 12 Jan 2027 open | 135 d |
| 30 Aug 2025 | PR06 Regular replenishment | 1 | Rp 3.0M | 27 Feb 2026 | 181 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 May 2025 | Low | PY_SDV-1973A | SDV-1973A limit switch faulty |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Feb 2026 | 1 | 201000016647 | Corrective |