Sparely
DU

SWITCH,LIMIT,TYPE GO122,CS

Material 4100054917 · SWITCH · Plant 1000

BSafety-criticalReduceNon-moving
Material
4100054917
Category
SWITCH
Base unit
EA
MRP type
Non Stock
Criticality
B (2 of 4 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
No PO history
Lead time
60 d · P80 112 d
Unit price
Rp 6.0M (est.)

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~60 days; expected demand during lead time 0.0.
  • 4.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 5.Stock 12 exceeds the level to keep (2) by 10.
  • 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.2%
stockout risk now 0%
Unit price
Rp 6.0M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 33.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.

Installed on 4 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1536B-CSS
CONTROL SWITCH STATION FOR PP-1536B-M
B100.19
PX_SDV-763A
CONDENSATE ISOLATION
B100.06
PX_SDV-1594
METHANE ISOLATION
S130.91
PX_SDV-224
PP-1720D SHUTDOWN VALVE
S100.06

Lead time and procurement

Lead time 60 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Jun 2026MediumPX_SDV-1594Leak from packing
23 Nov 2025HighPX_SDV-1594SDV-1594 limit switch faulty
02 Jun 2025MediumPX_SDV-1594Painting SDV-1594

Recent goods issues

Never issued in the 17-month history.

Sparely