SWITCH,LIMIT,SIZE OW112,PTFE
Material 4100055106 · SWITCH · Plant 1000
- Material
- 4100055106
- Category
- SWITCH
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 60 d · P80 112 d
- Unit price
- Rp 6.0M (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~60 days; expected demand during lead time 0.1.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 5.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 451.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_SDV-1728A ON-OFF VALVE | A | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 60 ± 27 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Apr 2026 | 1 | 204000022204 | Preventive |
| 22 Oct 2025 | 1 | 201000021250 | Corrective |