SWITCH,LIMIT,TYPE HL327,SS304

Material 4100055238 · SWITCH · Plant 1000

ASafety-criticalReduceSlow-moving
Material
4100055238
Category
SWITCH
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
60 d · P80 112 d
Unit price
Rp 6.0M (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~60 days; expected demand during lead time 0.2.
  • 4.A 96.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 6.
  • 5.Stock 7 exceeds the level to keep (6) by 1.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
6
order qty 6
Service level
96.6%
stockout risk now 0%
Unit price
Rp 6.0M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 285 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 145.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.

Installed on 2 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_SDV-1526
CHARGE GAS ISOLATION
A200.06
PX_SDV-345
PP-1659A SHUTDOWN VALVE
A100.06

Lead time and procurement

Lead time 60 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
20 Dec 20253201000020206Corrective
20 Dec 20252201000020206Corrective
20 Dec 20251201000020206Corrective