Sparely
DU

SWITCH,LIMIT,MODEL VX81,PTFE

Material 4100055302 · SWITCH · Plant 1000

BSafety-criticalReorderCriticalStockout
Material
4100055302
Category
SWITCH
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 2 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
60 d · P80 112 d
Unit price
Rp 6.0M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~60 days; expected demand during lead time 0.2.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 47.7M · order by 01 Oct 2026
Expected arrival ≈ 60 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 4%
Unit price
Rp 6.0M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 253 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 188.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~32 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1678A-CSS
CONTROL SWITCH STATION FOR PP-1678A-M
B100.19
PX_SDV-120
ON-OFF VALVE
S110.06

Lead time and procurement

Lead time 60 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 May 2025MediumPX_SDV-120PSM25/SDV-120 fail to close

Recent goods issues

Posting dateQtyOrderOrder type
21 Jan 20263201000028513Corrective
21 Jan 20261201000028513Corrective