TRANSMITTER,PRESS,MODEL DY707,INCOLOY

Material 4100055430 · TRANSMITTER · Plant 1000

ALong-leadReduceExcess
Material
4100055430
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (29 of 68 FuncLocs A/B)
Supplier
SAMUDRA MESINDO ABADI PT
Lead time
76 d · P80 107 d
Unit price
Rp 43.2M

Recommendation

  • 1.Forecast 15 EA/year: 15 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~76 days; expected demand during lead time 3.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 14.
  • 4.Stock 756 exceeds the level to keep (14) by 742.
  • 5.Long lead time: 80% of deliveries took up to 107 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 68 FuncLoc(s), 29 of them criticality A/B.
  • 7.ML early warning: 73% probability of demand in the next 90 days.
Long-leadML early warningSingle sourceAbnormal consumptionOpen PO
On hand / on order
756 / 9
next delivery 13 Dec 2026
Today Min / Max
15 / 28
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 8
Rec. Max
14
order qty 3
Service level
99.8%
stockout risk now 0%
Unit price
Rp 43.2M
PO history
ML early warning: 73% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 104 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 17 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 68 functional locations

29 with criticality A/B · 96 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_DPT-956-2A
DIFF. PRESSURE
A141.35
PX_TIT-680-43B
HE-1522 TEMPERATURE
A320.04
PX_FIT-600-3B
PP-287D INLET FLOW
A110.04
PX_DPT-1291-5B
VD-185 DP
A100.06
PX_DPT-462A
KC-671D DP
A100.06
PX_FIT-1125A
FLUSHING OIL FLOW
A200.04
PX_FIT-1560A
SLOP OIL FLOW
A100.04
PX_FIT-1842
FLOW
A400.04
PX_FIT-1992A-33B
PP-1751A INLET FLOW
A100.04
PX_FIT-921B
FLUSHING OIL FLOW
A100.04
PX_LIT-805
LEVEL
A100.03
PX_PIT-1005
RICH AMINE PRESSURE
A100.04

Lead time and procurement

Lead time 76 ± 35 days (PO history, 9 PO lines) · on-time 20%

PR dateTypeQtyUnit priceDeliveryLead time
19 Sept 2026PR06
Regular replenishment
9Rp 44.5M13 Dec 2026
open
85 d
22 Jul 2026PR06
Regular replenishment
15Rp 44.2M28 Sept 202668 d
24 Apr 2026PR03
Regular replenishment
14Rp 41.2M29 Jun 202666 d
23 Apr 2026PR06
Regular replenishment
10Rp 41.7M15 Jun 202653 d
19 Feb 2026PR03
Regular replenishment
14Rp 44.0M20 Mar 202629 d
12 Oct 2025PR04
Regular (other)
12Rp 41.4M24 Jan 2026104 d
09 Sept 2025PR06
Regular replenishment
6Rp 43.0M29 Oct 202550 d
04 Jun 2025PR03
Regular replenishment
15Rp 43.3M06 Oct 2025124 d
25 May 2025PR03
Regular replenishment
15Rp 43.2M14 Sept 2025112 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_PIT-997A-18Replace lamp as per PM finding
09 Sept 2026HighPX_TIT-1562TIT-1562 error
21 Aug 2026LowPX_DPT-956-2ADPT-956-2A abnormal indication
16 Jul 2026MediumPX_PIT-794AInstall cover plate for MCP cracking
17 Jun 2026MediumPX_DPT-956-2ALeak from packing
14 Jun 2026MediumPX_FIT-1027-48FIT-1027-48 error
05 Jun 2026HighPX_TIT-680-43BInstall scaffolding at TIT-680-43B
02 Jun 2026MediumPX_TIT-173B-42TIT-173B-42 abnormal indication
23 Apr 2026MediumPX_DPT-386Replace lamp as per PM finding
22 Sept 2025LowPX_TIT-173B-42TIT-173B-42 abnormal indication

Recent goods issues

Posting dateQtyOrderOrder type
19 Jun 20261201000017456Corrective
18 Jun 20263201000024332Corrective
17 Jun 20261201000024332Corrective
31 Mar 20261204000023773Preventive
25 Feb 20261201000016387Corrective
31 Jan 20261201000001515Corrective
31 Jan 20261201000001793Corrective
31 Jan 20262201000004172Corrective
30 Jan 20261201000024383Corrective
25 Jan 20261201000008178Corrective
18 Jan 20261201000015987Corrective
28 Dec 20252201000005329Corrective
18 Dec 20252201000028633Corrective
04 Dec 20251204000007693Preventive
28 Nov 20253201000006855Corrective