TRANSMITTER,PRESS,MODEL WD495,SS316
Material 4100055437 · TRANSMITTER · Plant 1000
ALong-leadMaintainHealthy
- Material
- 4100055437
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (15 of 32 FuncLocs A/B)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 81 d · P80 92 d
- Unit price
- Rp 60.4M
Recommendation
- 1.Forecast 8.8 EA/year: 8.8 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~81 days; expected demand during lead time 2.0.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 10.
- 4.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 32 FuncLoc(s), 15 of them criticality A/B.
- 6.ML early warning: 51% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemSingle sourceOpen PO
On hand / on order
3 / 10
next delivery 13 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
10
order qty 2
Service level
99.8%
stockout risk now 0%
Unit price
Rp 60.4M
PO history
ML early warning: 51% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 102 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 32 functional locations
15 with criticality A/B · 41 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FIT-996 SLOP OIL FLOW | A | 1 | 2 | 0.04 |
| PX_TIT-556A TEMPERATURE | A | 1 | 1 | 0.47 |
| UT_LIT-699-53 LEVEL | A | 1 | 1 | 0.03 |
| PX_DPT-1238 DIFF. PRESSURE | A | 1 | 0 | 0.06 |
| PX_LIT-1497 LEVEL | A | 1 | 0 | 0.03 |
| PX_LIT-805 LEVEL | A | 1 | 0 | 0.03 |
| PX_PIT-1253 QUENCH OIL PRESSURE | A | 1 | 0 | 0.04 |
| PX_PIT-1518 VD-786 PRESSURE | A | 1 | 0 | 0.04 |
| PX_PIT-187 PRESSURE | A | 1 | 0 | 0.04 |
| PY_LIT-1742A-50A PP-448 LEVEL | A | 1 | 0 | 0.03 |
| PX_PIT-1008 CONDENSATE PRESSURE | B | 1 | 2 | 0.47 |
| PX_FIT-1693A FLOW | B | 1 | 1 | 0.04 |
Lead time and procurement
Lead time 81 ± 41 days (PO history, 7 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Jul 2026 | PR06 Regular replenishment | 3 | Rp 59.4M | 16 Oct 2026 open | 86 d |
| 14 Jun 2026 | PR06 Regular replenishment | 3 | Rp 60.5M | 24 Jul 2026 | 40 d |
| 05 May 2026 | PR05 Project / turnaround | 7 | Rp 61.3M | 13 Oct 2026 open | 161 d |
| 14 Feb 2026 | PR06 Regular replenishment | 5 | Rp 60.9M | 18 May 2026 | 93 d |
| 01 Dec 2025 | PR06 Regular replenishment | 3 | Rp 60.4M | 24 Feb 2026 | 85 d |
| 14 Jun 2025 | PR06 Regular replenishment | 7 | Rp 58.8M | 03 Aug 2025 | 50 d |
| 27 May 2025 | PR06 Regular replenishment | 2 | Rp 60.0M | 05 Aug 2025 | 70 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Jun 2026 | Medium | PX_FIT-1027-48 | FIT-1027-48 error |
| 19 Mar 2026 | Medium | PX_PIT-758B-19 | PIT-758B-19 error |
| 29 Dec 2025 | Medium | PX_LIT-948 | Leak from packing |
| 18 Dec 2025 | Medium | PX_PIT-758B-19 | Leak from packing |
| 04 Dec 2025 | Medium | PX_FIT-996 | Install scaffolding at FIT-996 |
| 08 Nov 2025 | Medium | PX_PIT-1008 | Replace lamp as per PM finding |
| 02 Oct 2025 | Low | PX_LIT-948 | LIT-948 abnormal indication |
| 15 Aug 2025 | Medium | PX_TIT-556A | [MSI-B-25-FTU-227] Permanent repair |
| 04 Jul 2025 | Medium | PX_FIT-1027-48 | Replace lamp as per PM finding |
| 28 May 2025 | High | PX_PIT-1008 | Check PIT-1008.ok |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Jun 2026 | 2 | 201000017456 | Corrective |
| 31 May 2026 | 2 | 201000020779 | Corrective |
| 30 May 2026 | 1 | 201000020779 | Corrective |
| 16 May 2026 | 3 | 201000023535 | Corrective |
| 25 Jan 2026 | 1 | 201000008544 | Corrective |
| 24 Jan 2026 | 1 | 201000038721 | Corrective |
| 31 Dec 2025 | 1 | 201000035212 | Corrective |
| 22 Jul 2025 | 2 | 204000007341 | Preventive |
| 08 Jul 2025 | 1 | 204000011329 | Preventive |