TRANSMITTER,PRESS,TYPE HP64,VITON
Material 4100055471 · TRANSMITTER · Plant 1000
ALong-leadMaintainHealthy
- Material
- 4100055471
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (9 of 19 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 119 d · P80 126 d
- Unit price
- Rp 33.7M
Recommendation
- 1.Forecast 4.3 EA/year: 4.3 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~119 days; expected demand during lead time 1.4.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
- 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 19 FuncLoc(s), 9 of them criticality A/B.
- 6.ML early warning: 34% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemSingle sourceOpen PO
On hand / on order
3 / 5
next delivery 29 Mar 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
7
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 33.7M
PO history
ML early warning: 34% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 43 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 19 functional locations
9 with criticality A/B · 28 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TIT-1403D PP-1309A TEMPERATURE | A | 1 | 3 | 0.90 |
| UT_LIT-699-53 LEVEL | A | 1 | 1 | 0.03 |
| PX_PIT-1311B PRESSURE | A | 1 | 0 | 0.04 |
| PX_TIT-1655 VD-278A TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_TIT-1775 TEMPERATURE | A | 1 | 0 | 0.04 |
| PY_LIT-978-17 LEVEL | B | 1 | 1 | 0.03 |
| PX_PIT-1937 PRESSURE | B | 2 | 0 | 0.04 |
| PX_PIT-206 PP-1984A PRESSURE | B | 1 | 0 | 0.04 |
| PY_DPT-770 PP-1808A DP | B | 1 | 0 | 0.06 |
| PX_LIT-1030 VD-1943 LEVEL | C | 1 | 0 | 0.03 |
| PX_PIT-1682-10B PRESSURE | C | 1 | 0 | 0.04 |
| PX_PIT-767B HE-995C PRESSURE | C | 4 | 0 | 0.04 |
Lead time and procurement
Lead time 119 ± 45 days (PO history + category, 2 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 May 2026 | PR06 Regular replenishment | 3 | Rp 33.5M | 29 Mar 2027 open | 332 d |
| 22 Jan 2026 | PR05 Project / turnaround | 2 | Rp 33.9M | 20 Apr 2027 open | 453 d |
| 11 Jun 2025 | PR05 Project / turnaround | 1 | Rp 33.4M | 23 Jun 2026 | 377 d |
| 10 May 2025 | PR06 Regular replenishment | 2 | Rp 34.9M | 21 Jun 2025 | 42 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 Sept 2026 | Low | PX_TIT-1403D | Repair insulation TIT-1403D |
| 09 Sept 2026 | High | PX_TIT-1562 | TIT-1562 error |
| 07 Apr 2026 | Low | PX_TIT-1403D | TIT-1403D abnormal indication |
| 07 Oct 2025 | Low | PX_FIT-1923C | Check FIT-1923C.ok |
| 08 Jul 2025 | Medium | PX_FIT-1923C | Replace lamp as per PM finding |
| 31 May 2025 | Medium | PY_LIT-978-17 | PSM25/AR25/tranmsitter low performance |
| 27 May 2025 | Medium | UT_LIT-699-53 | AR25/tranmsitter low performance |
| 17 May 2025 | Medium | PX_TIT-1403D | Install scaffolding at TIT-1403D |
| 05 May 2025 | Medium | PX_TIT-1562 | TIT-1562 error |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Aug 2026 | 1 | 201000002111 | Corrective |
| 18 Aug 2026 | 1 | 201000002111 | Corrective |
| 03 Jul 2026 | 1 | 201000035815 | Corrective |
| 25 Dec 2025 | 1 | 201000024112 | Corrective |
| 16 Nov 2025 | 1 | 201000021456 | Corrective |
| 18 Oct 2025 | 1 | 201000034273 | Corrective |