TRANSMITTER,PRESS,TYPE HP64,VITON

Material 4100055471 · TRANSMITTER · Plant 1000

ALong-leadMaintainHealthy
Material
4100055471
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
A (9 of 19 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
119 d · P80 126 d
Unit price
Rp 33.7M

Recommendation

  • 1.Forecast 4.3 EA/year: 4.3 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~119 days; expected demand during lead time 1.4.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
  • 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 19 FuncLoc(s), 9 of them criticality A/B.
  • 6.ML early warning: 34% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemSingle sourceOpen PO
On hand / on order
3 / 5
next delivery 29 Mar 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
7
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 33.7M
PO history
ML early warning: 34% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 43 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 19 functional locations

9 with criticality A/B · 28 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TIT-1403D
PP-1309A TEMPERATURE
A130.90
UT_LIT-699-53
LEVEL
A110.03
PX_PIT-1311B
PRESSURE
A100.04
PX_TIT-1655
VD-278A TEMPERATURE
A100.04
PX_TIT-1775
TEMPERATURE
A100.04
PY_LIT-978-17
LEVEL
B110.03
PX_PIT-1937
PRESSURE
B200.04
PX_PIT-206
PP-1984A PRESSURE
B100.04
PY_DPT-770
PP-1808A DP
B100.06
PX_LIT-1030
VD-1943 LEVEL
C100.03
PX_PIT-1682-10B
PRESSURE
C100.04
PX_PIT-767B
HE-995C PRESSURE
C400.04

Lead time and procurement

Lead time 119 ± 45 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
01 May 2026PR06
Regular replenishment
3Rp 33.5M29 Mar 2027
open
332 d
22 Jan 2026PR05
Project / turnaround
2Rp 33.9M20 Apr 2027
open
453 d
11 Jun 2025PR05
Project / turnaround
1Rp 33.4M23 Jun 2026377 d
10 May 2025PR06
Regular replenishment
2Rp 34.9M21 Jun 202542 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026LowPX_TIT-1403DRepair insulation TIT-1403D
09 Sept 2026HighPX_TIT-1562TIT-1562 error
07 Apr 2026LowPX_TIT-1403DTIT-1403D abnormal indication
07 Oct 2025LowPX_FIT-1923CCheck FIT-1923C.ok
08 Jul 2025MediumPX_FIT-1923CReplace lamp as per PM finding
31 May 2025MediumPY_LIT-978-17PSM25/AR25/tranmsitter low performance
27 May 2025MediumUT_LIT-699-53AR25/tranmsitter low performance
17 May 2025MediumPX_TIT-1403DInstall scaffolding at TIT-1403D
05 May 2025MediumPX_TIT-1562TIT-1562 error

Recent goods issues

Posting dateQtyOrderOrder type
19 Aug 20261201000002111Corrective
18 Aug 20261201000002111Corrective
03 Jul 20261201000035815Corrective
25 Dec 20251201000024112Corrective
16 Nov 20251201000021456Corrective
18 Oct 20251201000034273Corrective