TRANSMITTER,PRESS,TYPE YD410,NBR

Material 4100055510 · TRANSMITTER · Plant 1000

AReorderNormalBelow reorder point
Material
4100055510
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 18 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 3.4 EA/year: 3.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~74 days; expected demand during lead time 0.7.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
  • 4.On hand 5 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 18 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 68.3M · order by 01 Oct 2026
Expected arrival ≈ 74 days
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
7
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 104 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 18 functional locations

6 with criticality A/B · 24 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_DPT-956-2A
DIFF. PRESSURE
A141.35
PX_FIT-1105
QUENCH WATER FLOW
A440.90
PX_FIT-1114
SEAL OIL FLOW
A120.47
PX_PIT-774-28A
PRESSURE
A110.04
PX_PIT-1005
RICH AMINE PRESSURE
A100.04
PX_DPT-443A
PP-1125B DP
B100.06
PX_DPT-382C
HE-1603 DP
C110.49
PX_FIT-1924
FLOW
C200.04
PX_FIT-409A
FLOW
C100.04
PX_PIT-1358-19
CL-816 PRESSURE
C200.04
PX_PIT-1689A-21A
PRESSURE
C100.04
PX_TIT-1625B-48A
PP-1478B TEMPERATURE
C100.04

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Aug 2026LowPX_DPT-956-2ADPT-956-2A abnormal indication
26 Jun 2026MediumPX_FIT-1105FIT-1105 reading frozen
17 Jun 2026MediumPX_DPT-956-2ALeak from packing
12 May 2026MediumPX_FIT-1114Replace lamp as per PM finding
02 Jan 2026EmergencyPX_FIT-1105Painting FIT-1105
15 Sept 2025LowPX_FIT-1105Leak from packing
17 Aug 2025LowPX_DPT-956-2AAR25/tranmsitter low performance
25 Jul 2025MediumPX_DPT-1847Leak from packing
25 Jul 2025LowPX_DPT-382C[MSI-B-25-WXX-325] Permanent repair
23 May 2025HighPX_DPT-956-2AInstall scaffolding at DPT-956-2A

Recent goods issues

Posting dateQtyOrderOrder type
19 Jun 20261201000018305Corrective
27 Dec 20253201000024013Corrective
08 Dec 20251201000038166Corrective