TRANSMITTER,PRESS,TYPE JZ960,CS
Material 4100055535 · TRANSMITTER · Plant 1000
ALong-leadReduceExcess
- Material
- 4100055535
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 13 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 71 d · P80 92 d
- Unit price
- Rp 21.3M
Recommendation
- 1.Forecast 6.8 EA/year: 6.8 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~71 days; expected demand during lead time 1.3.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
- 4.Stock 17 exceeds the level to keep (9) by 8.
- 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 13 FuncLoc(s), 3 of them criticality A/B.
- 7.ML early warning: 58% probability of demand in the next 90 days.
Long-leadML early warningSingle source
On hand / on order
17 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
9
order qty 3
Service level
99.8%
stockout risk now 0%
Unit price
Rp 21.3M
PO history
ML early warning: 58% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 71 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 10 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 13 functional locations
3 with criticality A/B · 16 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_DPT-1557A DIFF. PRESSURE | A | 1 | 12 | 3.92 |
| PX_FIT-729 FLOW | A | 4 | 1 | 0.47 |
| PX_PIT-1521C QUENCH OIL PRESSURE | B | 1 | 0 | 0.04 |
| PX_FIT-1842-47B KC-145 INLET FLOW | C | 1 | 3 | 0.90 |
| PX_TIT-462-53A PP-1751A TEMPERATURE | C | 1 | 2 | 0.04 |
| PX_LIT-619A LEVEL | C | 1 | 0 | 0.03 |
| PX_PIT-1369-21B VD-727 PRESSURE | C | 1 | 0 | 0.04 |
| PX_DPT-145 HE-224C DP | S | 1 | 0 | 0.06 |
| PX_LIT-447 HE-1766D LEVEL | S | 1 | 0 | 0.03 |
| PX_LIT-789-14 HE-1590B LEVEL | S | 1 | 0 | 0.03 |
| PX_PIT-210-19A FEED PRESSURE | S | 1 | 0 | 0.04 |
| PX_TIT-1722B VD-1730 TEMPERATURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 71 ± 37 days (PO history, 4 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Jan 2026 | PR03 Regular replenishment | 3 | Rp 21.2M | 26 Mar 2026 | 84 d |
| 28 Oct 2025 | PR03 Regular replenishment | 3 | Rp 21.9M | 09 Dec 2025 | 42 d |
| 05 Oct 2025 | PR03 Regular replenishment | 6 | Rp 21.3M | 17 Jan 2026 | 104 d |
| 04 Jun 2025 | PR03 Regular replenishment | 3 | Rp 21.4M | 17 Jul 2025 | 43 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_DPT-1557A | Install scaffolding at DPT-1557A |
| 10 Aug 2026 | Medium | PX_DPT-1557A | Leak from packing |
| 05 Aug 2026 | Low | PX_DPT-1557A | DPT-1557A reading frozen |
| 18 Jul 2026 | Medium | PX_FIT-1842-47B | FIT-1842-47B reading frozen |
| 08 Jul 2026 | Low | PX_DPT-1557A | Repair insulation DPT-1557A |
| 23 Jun 2026 | Medium | PX_DPT-1557A | AR25/tranmsitter low performance |
| 20 Jun 2026 | Medium | PX_DPT-1557A | [MSI-B-26-PMN-328] Permanent repair |
| 04 May 2026 | Medium | PX_FIT-1842-47B | Leak from packing |
| 27 Jan 2026 | Low | PX_DPT-1557A | Leak from packing |
| 17 Dec 2025 | Low | PX_DPT-1557A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Jul 2026 | 1 | 201000023386 | Corrective |
| 21 Jul 2026 | 2 | 201000023386 | Corrective |
| 24 Jun 2026 | 1 | 204000013750 | Preventive |
| 05 Jan 2026 | 1 | 201000025848 | Corrective |
| 22 Dec 2025 | 1 | 201000011542 | Corrective |
| 08 Dec 2025 | 1 | 201000028561 | Corrective |
| 04 Nov 2025 | 1 | 201000010987 | Corrective |
| 02 Nov 2025 | 1 | 201000010987 | Corrective |
| 09 Oct 2025 | 1 | 201000025699 | Corrective |
| 08 Oct 2025 | 1 | 201000025699 | Corrective |