TRANSMITTER,PRESS,SIZE IG306,SS304

Material 4100055552 · TRANSMITTER · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100055552
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 12 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
122 d · P80 126 d
Unit price
Rp 30.9M

Recommendation

  • 1.Forecast 3.3 EA/year: 3.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~122 days; expected demand during lead time 1.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 12 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 185.7M · order by 01 Oct 2026
Expected arrival ≈ 122 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
3 / 5
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
8
order qty 2
Service level
99.9%
stockout risk now 18%
Unit price
Rp 30.9M
PO history
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 200 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 12 functional locations

6 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-774-28A
PRESSURE
A110.04
PX_FIT-1842
FLOW
A100.04
PX_LIT-893
CL-1681 LEVEL
A100.03
PX_PIT-1005
RICH AMINE PRESSURE
A100.04
PX_PIT-1298-23A
PRESSURE
A100.04
PX_PIT-1593
PRESSURE
A100.04
PX_PIT-1358-19
CL-816 PRESSURE
C100.04
PX_DPT-1236-23A
DIFF. PRESSURE
S100.06
PX_LIT-1297A
LEVEL
S100.03
PX_LIT-1841
LEVEL
S100.03
PX_PIT-1333-39
PP-1811A PRESSURE
S100.04
PX_TIT-1745
CL-962 TEMPERATURE
S100.04

Lead time and procurement

Lead time 122 ± 45 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
10 Nov 2025PR04
Regular (other)
2Rp 31.5M05 May 2026176 d
30 May 2025PR04
Regular (other)
2Rp 30.4M27 Dec 2025211 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 May 2025HighPX_PIT-774-28AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
15 Mar 20261204000017829Preventive
14 Feb 20261201000033319Corrective
13 Feb 20261201000033319Corrective
24 Dec 20252201000007346Corrective
20 Dec 20252201000035634Corrective