TRANSMITTER,PRESS,TYPE RD630,SS304

Material 4100055617 · TRANSMITTER · Plant 1000

BReorderCriticalStockout
Material
4100055617
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
B (4 of 9 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
59 d · P80 54 d
Unit price
Rp 20.8M

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~59 days; expected demand during lead time 0.2.
  • 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 1 is at or below the reorder point: order 1 now.
  • 5.Installed on 9 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 20.8M · order by 01 Oct 2026
Expected arrival ≈ 59 days
Convert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 04 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.8%
stockout risk now 1%
Unit price
Rp 20.8M
PO history
ML early warning: 24% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 158 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 197.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~37 days.

Installed on 9 functional locations

4 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-433A-16A
FLOW
B100.04
PX_PIT-1531
HE-1967C PRESSURE
B100.04
PX_PIT-1669
PP-820A PRESSURE
B100.04
PX_PIT-564C
PRESSURE
B100.04
PX_FIT-763B
FLOW
C210.04
PX_TIT-527B
TEMPERATURE
C200.04
PX_DPT-1229A-1B
DIFF. PRESSURE
S120.92
PX_FIT-1446A
FLOW
S100.04
PX_PIT-1549
PRESSURE
S100.04

Lead time and procurement

Lead time 59 ± 27 days (PO history, 4 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
27 Aug 2026PR03
Regular replenishment
1Rp 20.2M04 Oct 2026
open
38 d
28 May 2026PR04
Regular (other)
2Rp 20.6M04 Aug 202668 d
26 May 2026PR06
Regular replenishment
2Rp 21.4M04 Jul 202639 d
13 Dec 2025PR06
Regular replenishment
1Rp 21.1M27 Jan 202645 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 May 2026LowPX_DPT-1229A-1BInstall cover plate for MCP cracking
17 Jul 2025MediumPX_DPT-1229A-1BAR25/tranmsitter low performance
16 Jul 2025MediumPX_FIT-763BInstall scaffolding at FIT-763B

Recent goods issues

Posting dateQtyOrderOrder type
26 Apr 20261204000038073Preventive
04 Jan 20261201000005471Corrective