TRANSMITTER,PRESS,SIZE VO777,VITON

Material 4100055618 · TRANSMITTER · Plant 1000

ALong-leadMaintainHealthy
Material
4100055618
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 8 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
110 d · P80 126 d
Unit price
Rp 45.0M

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~110 days; expected demand during lead time 0.3.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 8 FuncLoc(s), 5 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
2 / 1
next delivery 24 Mar 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 45.0M
PO history
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 165 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 776.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 8 functional locations

5 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-600-3B
PP-287D INLET FLOW
A110.04
PX_TIT-414C
TEMPERATURE
A110.47
PX_FIT-1125A
FLUSHING OIL FLOW
A100.04
PX_FIT-1115
HE-605 INLET FLOW
B120.47
PX_FIT-214B
FLOW
B100.04
PX_PIT-427B-28
QUENCH WATER PRESSURE
C110.04
PX_FIT-1957A
FLOW
C100.04
PX_TIT-117A
HE-391 TEMPERATURE
S400.04

Lead time and procurement

Lead time 110 ± 45 days (PO history + category, 1 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
18 Aug 2026PR06
Regular replenishment
1Rp 45.0M24 Mar 2027
open
218 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Aug 2026LowPX_FIT-1115FIT-1115 error
08 Jun 2025MediumPX_TIT-414CLeak from packing
20 May 2025LowPX_FIT-600-3BAR25/tranmsitter low performance
07 May 2025MediumPX_FIT-1115PSM25/AR25/tranmsitter low performance
07 May 2025MediumPX_PIT-427B-28AR25/tranmsitter low performance

Recent goods issues

Posting dateQtyOrderOrder type
19 Apr 20261201000010635Corrective
15 Jan 20261201000025571Corrective